CASE STUDY:
Matraville Public School - 2.9 kW Solar PV

GENERAL INFORMATION

Address: 310 Bunnerong Road, Hillsdale NSW 2036
Site Type: Public School

SITE DESCRIPTION

  • Matraville Public School operates 5 days per week with an exclusively daytime load comprising mainly of a HVAC system and lighting.
  • Matraville Public School installed this system ontop of an already present solar PV system in an effort to further reduce electricity bills. 

OUR SOLUTION

  • Installed a 2.9 kw Solar PV system, consisting of 10 x 290W poly-crystalline modules.
  • Tilt mounting system to maximize the cost-effectiveness of the system.
  • SolarEdge System Monitoring

RESULTS


Estimated Annual Savings
$658

CO2 Emission Reduction (p.a)
3.65 Tons


Annual Energy Reduction
4.17 MWh

Copyright © 2018
All Rights Reserved.