It is a new 3-level new developed house, with estimation of 100kWh daily electrical usage. It will have a pool that will be consumes 20% of the electricity usage.
OUR SOLUTION
Installed 15.6kW PV system with 42 x Longi 370W modules and 1 x 15kW Huawei Inverters. Panels installed in separate roof level due to needs of space for a larger system.
With the new system installed in the property, it enables the owner to control their pool energy usage in the future, by planning maintenance and run the pool pump during solar production hour and switch pump off at night.